Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the supply and installation of playground equipment, a perimeter walkway, 9" of compacted engineered wood fiber surfacing, benches, and park signage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design, supply, and installation of playground site improvements at Carroll Park.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
Design, supply, and installation of playground site improvements at Carroll Park.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Spring Hill requests qualified playground equipment manufacturers/vendors to design, supply, remove existing equipment, and install an inclusive, ADA/IPEMA/CPSC/ASTM-compliant playground at Harvey Park. Scope includes raising the play area a minimum of 1 foot with drainage and grading plans, site preparation, factory-certified installation, documentation of warranties and product liability insurance, and meeting specified bonding and insurance requirements. Project completion is required within 120 days of Notice to Proceed; bid security and 100% performance/payment bonds are required.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
City of Spring Hill requests qualified playground equipment manufacturers/vendors to design, supply, remove existing equipment, and install an inclusive, ADA/IPEMA/CPSC/ASTM-compliant playground at Harvey Park. Scope includes raising the play area a minimum of 1 foot with drainage and grading plans, site preparation, factory-certified installation, documentation of warranties and product liability insurance, and meeting specified bonding and insurance requirements. Project completion is required within 120 days of Notice to Proceed; bid security and 100% performance/payment bonds are required.
AvailableWork includes installation of playground equipment at park.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Work includes installation of playground equipment at park.
AvailableSite survey, concept planning, detailed design, permitting, and supply and installation/construction.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Site survey, concept planning, detailed design, permitting, and supply and installation/construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →