CountyFL
Posted
Sep 2, 2026
Oct 5, 2026
Automated Weather Observing System (AWOS) Construction RFP
Work includes 1 AL awos iii p/t florida power and lighting utility services (please insert $25,000 in unit cost column as allowance amount); 1,500 LF 1/c #4 awg 600v, thwn-2 conductor, installed in duct or conduit; 500 LF 1/c #2 awg solid copper counterpoise cable, installed over duct or conduit; 20 EA 3/4" dia by 10. 00 long copper clad steel sectional ground rod; 400 LF 1 way 2" schedule 40 pvc direct earth buried duct; 100 LF 1 way 2" schedule 40 pvc concrete encased duct; 1 EA l-867b junction can.