OtherWV
Posted
Oct 20, 2026
Oct 30, 2026
Roof Replacement RFP
The removal of the existing roof; Repair/replacement of inferior decking materials; The installation of a shingle roof; The installation of gutters and downspouts;
Description: The scope of work includes reroofing with fully adhered EPDM roof membrane and ballasted EPDM roof membrane, steel roof deck replacement, roofing related sheet metal, related masonry work, metal wall panel system, and all work.
HigherEducation · WI, US
From the first pre-RFP signals to the published RFP and its files.
Proposed budget
475 days before RFP
The proposed FY2025-2026 capital budget lists $445,000 for AU Roof Sections F and G Replacement.
Summary -- FY 2026 Capital Project Requests \> $50,000 30 NWTC BUDGET 2025-2026 Project Title Total Cost Project Title Total Cost Academic Affairs & Workforce Development Facilities Improvements (continued) 1 BT300 CTED Training Center Renovation Phase 1 2,361,000$ 32 MN Loader Tractor Replacement 52,500$ 2 BT322 & BT323 CTED & Talent & Culture…
Northeast Wisconsin Technical College FY2025-2026 Proposed Budget
Proposed budget · Jul 1, 2025
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (13 days left)
Adjacent opportunities open for bidding right now.
OtherWV
Posted
Oct 20, 2026
Oct 30, 2026
The removal of the existing roof; Repair/replacement of inferior decking materials; The installation of a shingle roof; The installation of gutters and downspouts;
Northeast Wisconsin Technical College
Higher EducationWI
Posted
Oct 19, 2026
Nov 17, 2026
Northeast Wisconsin Technical College is soliciting bids to replace roof areas AG-1, AG-1A, AG-2, and AG-4 at its Green Bay campus. The work includes fully adhered EPDM roofing, roofing-related sheet metal, and associated work shown on the drawings. Bids are due November 17, 2026, at 2:00 p.m. Central.
School DistrictLA
Posted
Oct 28, 2026
Dec 3, 2026
Provide partial roof replacement.
City of Cheyenne Board of Public Utilities
Special DistrictWY
Posted
Oct 2, 2026
Nov 5, 2026
Work inlcudes removing the existing ballasted roofing system; installing a new, non-ballasted membrane roofing system with insulation and cover board; and replacing coping.
Decision makers connected to this RFP from Northeast Wisconsin Technical College.