Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Corps of Engineers, Wilmington District (ENDIST Wilmington) issued a presolicitation for bank stabilization and maintenance dredging at AIWW Snows Cut in New Hanover County, North Carolina, covering up to 7,100 feet of shoreline across four areas. The project is a small business set-aside, firm-fixed-price construction requirement with an estimated magnitude between $10,000,000 and $25,000,000 and NAICS 237990. The formal solicitation will be released electronically on or about 2026-02-19 and all solicitation documents will be available on SAM.gov; offerors must be registered in SAM to download documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Perform fy26 AIWW dredge material placement facility (DMPF) improvements. Work includes the repair and improvement of four atlantic intracoastal waterway (AIWW upland placement. Upland placement areas will also require the complete replacement of spillway systems which consists of a platform structure, stoplogs, and pipe system to drain water from future dredged material to be placed at the site.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Perform fy26 AIWW dredge material placement facility (DMPF) improvements. Work includes the repair and improvement of four atlantic intracoastal waterway (AIWW upland placement. Upland placement areas will also require the complete replacement of spillway systems which consists of a platform structure, stoplogs, and pipe system to drain water from future dredged material to be placed at the site.
AvailableUp to seventy-eight thousand (78,000) cubic yards of maintenance material is expected to be removed from the federally maintained channel from daufuskie reach. Up to one hundred thirty thousand (130,000) CY of maintenance material is expected to be removed from the federally maintained channel.
Posted Date
Nov 6, 2025
Due Date
Jan 23, 2026
Release: Nov 6, 2025
Close: Jan 23, 2026
Up to seventy-eight thousand (78,000) cubic yards of maintenance material is expected to be removed from the federally maintained channel from daufuskie reach. Up to one hundred thirty thousand (130,000) CY of maintenance material is expected to be removed from the federally maintained channel.
AvailableRelease: Dec 26, 2025
Close: Jan 30, 2026
Riverwest bank stabilization.
AvailableThis solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis