CityIL
Posted
Aug 25, 2026
Sep 15, 2026
2027 Water Treatment Plant Chemicals Technical Proposals (Invitation For Bid)
Seeking proposal for phase 1 - 2027 water treatment plant chemicals reverse auction.
Description: Work includes roof replacement. The roof will be completely removed in a "tear-off" application. The "tear-off" application includes complete removal of all roofing components (asphalt shingles, underlayment, edge metal and wood trim down to the roof decking level (plywood), followed by the installation of new single-ply roofing system (adhered 90-mil EPDM) according to 225 CMR 23.00 Massachusetts commercial stretch energy code, which is based on the 2021 international energy conservation code (IECC), roof replacement "tear-off" projects need to comply with the energy performance requirements for new construction. Therefore, insulation is required to be installed continuously above the roof deck with a maximum roof assembly U-factor of U-0.032, which is a minimum r-value of approx. R-31.25. See attached file.
City · MA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Amherst.
These related opportunities are still open for bidding.
CityIL
Posted
Aug 25, 2026
Sep 15, 2026
Seeking proposal for phase 1 - 2027 water treatment plant chemicals reverse auction.
Special DistrictSD
Posted
Aug 28, 2026
Sep 8, 2026
Remove and dispose of the existing ballasted, insulation and roof membrane. Furnish and install new, 4" insulation, fully adhered 60 mil black membrane roof and accessories at the east water treatment plant. Work shall include installation of associated membrane flashing as walls, curbs, pipes and penetrations, new metal coping, and scuppers.
Special DistrictTX
Posted
Aug 13, 2026
Sep 23, 2026
Lodge roof replacement project. Scope of work includes - removal of existing natural slate roofing material down to the wood decking; inspect all roof decking for rot or damage; install high-performance synthetic underlayment across the entire roof surface according to manufacturer specifications for premium synthetic slate; see attached file.
Special DistrictTN
Posted
Sep 3, 2026
Sep 29, 2026
Work includes to remove existing hvac systems and water heaters and replace with new equipment.