Closed

Atkins Water Treatment Plant Roof Replacement (Invitation For Bid)

Description: Work includes roof replacement. The roof will be completely removed in a "tear-off" application. The "tear-off" application includes complete removal of all roofing components (asphalt shingles, underlayment, edge metal and wood trim down to the roof decking level (plywood), followed by the installation of new single-ply roofing system (adhered 90-mil EPDM) according to 225 CMR 23.00 Massachusetts commercial stretch energy code, which is based on the 2021 international energy conservation code (IECC), roof replacement "tear-off" projects need to comply with the energy performance requirements for new construction. Therefore, insulation is required to be installed continuously above the roof deck with a maximum roof assembly U-factor of U-0.032, which is a minimum r-value of approx. R-31.25. See attached file.

Buyer
City of Amherst

City · MA, US

Released
-
Closes
Sep 2, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts