FederalDC
Jul 31, 2026
Closes
Aug 8, 2026
UPS System Upgrade - (Request for Quote)
UPS system upgrade and calibration. The Contractor shall provide trained technical personnel to perform the following tasks: Installation: Install the 93PM - UPS 20kW Universal Power Modules and associated manufacturer-specified system components. Battery Replacement & Disposal: Replace current aged-out batteries. The Contractor is responsible for the removal, transportation, and proper environmental disposal/recycling of all old batteries in accordance with all applicable Federal, State, and local environmental regulations. Inspection & Verification: Inspect and verify all wiring and connections of the UPS system to ensure compliance with required electrical and manufacturer configurations. See attached file.