Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove approxi 48,000 SF of asphalt. Install 6 inches of road base (demolished paving could be used as base if dry enough). Install 4 inches of new asphalt paving. Seal coat, two coats, with specified Guardtop product (30-day to 40-day cure based on weather). Provide permanent striping (no temp striping needed) using specified product. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
3 kit, parts kit seal replacement, NSN: 5330-01-476-2026, P/N: 13169-RK.
Posted Date
Nov 20, 2025
Due Date
Nov 20, 2026
Release: Nov 20, 2025
Close: Nov 20, 2026
3 kit, parts kit seal replacement, NSN: 5330-01-476-2026, P/N: 13169-RK.
AvailableAsphalt repairs for waterline replacement projects & street maintenance - utilities department.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
Asphalt repairs for waterline replacement projects & street maintenance - utilities department.
AvailableRemoval of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
Posted Date
Mar 20, 2025
Due Date
Jan 21, 2026
Release: Mar 20, 2025
Close: Jan 21, 2026
Removal of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
AvailableMobilization; 122,232 lb, sealing existing pavement cracks & joints; 602,454 sy, asphalt surface treatment, double seal; 35,477 sy, asphalt surface treatment, fog seal; 331,353 gal, emulsion for asphalt surface treatment. See attached file for full scope.
Posted Date
Dec 17, 2025
Due Date
Jan 7, 2026
Release: Dec 17, 2025
Close: Jan 7, 2026
Mobilization; 122,232 lb, sealing existing pavement cracks & joints; 602,454 sy, asphalt surface treatment, double seal; 35,477 sy, asphalt surface treatment, fog seal; 331,353 gal, emulsion for asphalt surface treatment. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis