CityMA
Aug 11, 2026
Closes
Sep 3, 2026
FY2027-04 RFB for Steam Boiler Replacement at the Asa Waters Mansion
Project includes eplacement of the steam heating boiler, Chimney repointing, interior, Hoffman No. 8 Return Line Valve / No. 18 Radiator Trap — inspect and rebuild with new cage unit or capsule, reusing existing body; Radiator supply valve — inspect, free up, repack, and restore to operation.