Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This phased project involves replacing valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
This phased project involves replacing valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Cortez seeks bids for the installation of a new raw water valve, including associated piping and electrical work at the Water Treatment Plant. The project involves demolition, structural support installation, and requires contractors to meet specific bonding and experience criteria.
Posted Date
Nov 5, 2025
Due Date
Jan 5, 2026
Release: Nov 5, 2025
Close: Jan 5, 2026
The City of Cortez seeks bids for the installation of a new raw water valve, including associated piping and electrical work at the Water Treatment Plant. The project involves demolition, structural support installation, and requires contractors to meet specific bonding and experience criteria.
AvailableWork includes incorporation of a new raw water flow control valve and associated process piping and electrical in the micro hydro power building. The project also includes demolition work and provision / installation of structural support members, grating, and pipe supports.
Posted Date
Nov 5, 2025
Due Date
Jan 5, 2026
Release: Nov 5, 2025
Close: Jan 5, 2026
Work includes incorporation of a new raw water flow control valve and associated process piping and electrical in the micro hydro power building. The project also includes demolition work and provision / installation of structural support members, grating, and pipe supports.
AvailableConstruction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →