Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes incorporation of a new raw water flow control valve and associated process piping and electrical in the micro hydro power building. The project also includes demolition work and provision / installation of structural support members, grating, and pipe supports.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Cortez seeks bids for the installation of a new raw water valve, including associated piping and electrical work at the Water Treatment Plant. The project involves demolition, structural support installation, and requires contractors to meet specific bonding and experience criteria.
Posted Date
Nov 5, 2025
Due Date
Jan 5, 2026
Release: Nov 5, 2025
Close: Jan 5, 2026
The City of Cortez seeks bids for the installation of a new raw water valve, including associated piping and electrical work at the Water Treatment Plant. The project involves demolition, structural support installation, and requires contractors to meet specific bonding and experience criteria.
AvailableThe purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
The purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
AvailableThis phased project involves replacing valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
This phased project involves replacing valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
AvailableAbandon existing raw water intake, construct new screened raw water intake within riverbed and pipe to new clear well with a flushing vault and maintenance pump. Install new pump in clear well, flow control valve in the Water Treatment Plant (WTP); install raw water transmission line from clear well to existing intake vault. Construct a new building over existing intake vault. Install piping, pumps, and appurtenances to connect new infrastructure to existing raw water transmission line/WTP. Place rip rap along riverbank.
Posted Date
Nov 5, 2025
Due Date
Jan 7, 2026
Release: Nov 5, 2025
Close: Jan 7, 2026
Abandon existing raw water intake, construct new screened raw water intake within riverbed and pipe to new clear well with a flushing vault and maintenance pump. Install new pump in clear well, flow control valve in the Water Treatment Plant (WTP); install raw water transmission line from clear well to existing intake vault. Construct a new building over existing intake vault. Install piping, pumps, and appurtenances to connect new infrastructure to existing raw water transmission line/WTP. Place rip rap along riverbank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis