Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Columbus Recreation and Parks is soliciting preventative maintenance and repair services for water slides at multiple city pools to ensure safety and operational readiness. The one-year contract requires inspections, cleaning, repairs (fiberglass/structural), re-caulking, waxing, and documentation including before-and-after photos, with all products subject to City approval. Bidders must be registered vendors with the City of Columbus, comply with the stated prevailing wage ($21.33/hr), provide employee health insurance, submit references, technician certifications, and a detailed preventative maintenance proposal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contract for waterslide restoration at the park pool. Including: A. Fiberglass Slide Surface Restoration: The contractor shall restore the existing fiberglass slide riding surface to improve appearance, performance, and longevity. Work shall include: • Removal of mineral deposits, calcium buildup, oxidation, and surface contaminants. • Progressive surface preparation using appropriate abrasive methods. • Surface polishing and buffing to restore smoothness. • Application of a UV-resistant protective coating or wax suitable for fiberglass water slides. Final finish shall provide a smooth, slip-controlled surface appropriate for rider safety. B. Steel Corrosion Mitigation The contractor shall perform corrosion mitigation on exposed steel components associated with the slide structure. Work shall include: Removal of rust and corrosion using mechanical methods; Cleaning and surface preparation of treated areas; Application of appropriate primers; Application of a marine-grade or industrial-grade protective coating system designed for corrosion resistance in wet environments. C. Non-Skid Application on Metal Stairs The contractor shall apply a non-skid walking surface to the existing metal stair treads serving the slide. Work shall include: Mechanical surface preparation to achieve proper adhesion. Cleaning and preparation of the substrate. Application of primer compatible with the final coating system. Application of a durable, high-solids, slip-resistant coating designed for wet, outdoor environments. D. Installation of Safety Barriers Beneath Stair Structure: The contractor shall install safety netting beneath the water slide stairs to prevent access underneath the structure. Work shall include: Furnishing and installing durable netting or barrier material; Netting shall be secured using symmetrically aligned anchor points consistent with the slide handrails to allow the netting to hang straight and uniform; Anchor bolts shall be drilled into the concrete floor for the primary attachment point. Secondary attachment shall be completed using drilled anchor points or eyebolts, with eyebolts preferred for a clean and finished appearance; All fastening shall be completed using professional-grade methods to ensure a secure, durable, and visually cohesive installation; Materials shall be suitable for outdoor, aquatic facility environments.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
Contract for waterslide restoration at the park pool. Including: A. Fiberglass Slide Surface Restoration: The contractor shall restore the existing fiberglass slide riding surface to improve appearance, performance, and longevity. Work shall include: • Removal of mineral deposits, calcium buildup, oxidation, and surface contaminants. • Progressive surface preparation using appropriate abrasive methods. • Surface polishing and buffing to restore smoothness. • Application of a UV-resistant protective coating or wax suitable for fiberglass water slides. Final finish shall provide a smooth, slip-controlled surface appropriate for rider safety. B. Steel Corrosion Mitigation The contractor shall perform corrosion mitigation on exposed steel components associated with the slide structure. Work shall include: Removal of rust and corrosion using mechanical methods; Cleaning and surface preparation of treated areas; Application of appropriate primers; Application of a marine-grade or industrial-grade protective coating system designed for corrosion resistance in wet environments. C. Non-Skid Application on Metal Stairs The contractor shall apply a non-skid walking surface to the existing metal stair treads serving the slide. Work shall include: Mechanical surface preparation to achieve proper adhesion. Cleaning and preparation of the substrate. Application of primer compatible with the final coating system. Application of a durable, high-solids, slip-resistant coating designed for wet, outdoor environments. D. Installation of Safety Barriers Beneath Stair Structure: The contractor shall install safety netting beneath the water slide stairs to prevent access underneath the structure. Work shall include: Furnishing and installing durable netting or barrier material; Netting shall be secured using symmetrically aligned anchor points consistent with the slide handrails to allow the netting to hang straight and uniform; Anchor bolts shall be drilled into the concrete floor for the primary attachment point. Secondary attachment shall be completed using drilled anchor points or eyebolts, with eyebolts preferred for a clean and finished appearance; All fastening shall be completed using professional-grade methods to ensure a secure, durable, and visually cohesive installation; Materials shall be suitable for outdoor, aquatic facility environments.
Furnishing of aquatics equipment and supplies.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Furnishing of aquatics equipment and supplies.
AvailableResurface interior and exterior; re-caulk the interior riding path seams; perform minor fiberglass repairs.
Posted Date
Jan 28, 2026
Due Date
Feb 6, 2026
Release: Jan 28, 2026
Close: Feb 6, 2026
Resurface interior and exterior; re-caulk the interior riding path seams; perform minor fiberglass repairs.
AvailableProcurement of furniture for the Community and Aquatics Center.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Procurement of furniture for the Community and Aquatics Center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis