Closing soon

Appoquinimink School District - Brick Mill Elementary School - Roof Recover RFP

Description: The scope of the project consists of a full epdm roof recover over the existing modified asphalt bitumen roof. A total of +/- 67,422 s. F. The roof recover assembly will be of a new 115-mil fleece- back epdm directly adhered over to the existing modified bur roof with a two component, extrusion or spray applied, low-rise adhesive as described in the attached new work sheets. All existing roof edge metals will remain in place unless required to be removed / reinstalled to perform new roof recover work. All existing mechanical / electrical roof top devices, units, etc. To remain in their entirety and only to be modified / removed & reinstalled as required to perform new roof work. The one project alternate is to reinstall and re certify the existing building wide lightning protection system in its original location.

Buyer
Appoquinimink School District

SchoolDistrict · DE, US

Released
Jul 31, 2026
Closes
Aug 26, 2026(9 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts