Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Apply methacrylate, polyester concrete overlay, and deck spall repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include 40 LF of removal of curb & gutter; 641 SY of removal of bituminous surfacing; 1 LS of removal of existing retaining wall; 511 TN of salvaged base course; 155 TN of commercial grade hot mix asphalt; 360 SY of bridge approach slab-remove & replace; 22,074 SY of penetrating water repellent treatment; 3,830 LF of bridge deck crack sealing; 18,660 sf of special surface finish; 846 CY of overlay concrete; 34 CY of deck concrete; 102 SY of class 4 removal; 194 sf of deck spall repair; 4 EA of portable rumble strips; 29 EA of type iii barricade; 2 EA of sidewalk barricade; etc, see attached file.
Posted Date
Dec 22, 2025
Due Date
Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 16, 2026
Work include 40 LF of removal of curb & gutter; 641 SY of removal of bituminous surfacing; 1 LS of removal of existing retaining wall; 511 TN of salvaged base course; 155 TN of commercial grade hot mix asphalt; 360 SY of bridge approach slab-remove & replace; 22,074 SY of penetrating water repellent treatment; 3,830 LF of bridge deck crack sealing; 18,660 sf of special surface finish; 846 CY of overlay concrete; 34 CY of deck concrete; 102 SY of class 4 removal; 194 sf of deck spall repair; 4 EA of portable rumble strips; 29 EA of type iii barricade; 2 EA of sidewalk barricade; etc, see attached file.
AvailableConstruction area signs; 84 ton hot mix asphalt (type a); 620 SY cold plane asphalt concrete pavement; 49 CF rapid setting concrete (patch); 1,902 CF furnish polyester concrete overlay.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Construction area signs; 84 ton hot mix asphalt (type a); 620 SY cold plane asphalt concrete pavement; 49 CF rapid setting concrete (patch); 1,902 CF furnish polyester concrete overlay.
AvailableThe work consist of approx 731.79 SY deck overlay; 29.4 excavation; 40 LF concrete barrier railing; 167 SF concrete repair; 431.55 SY macadam stone slope protection.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The work consist of approx 731.79 SY deck overlay; 29.4 excavation; 40 LF concrete barrier railing; 167 SF concrete repair; 431.55 SY macadam stone slope protection.
AvailableProvide 2026 concrete repair projects and asphalt mill and overlay projects.
Posted Date
Dec 23, 2025
Due Date
Jan 13, 2026
Release: Dec 23, 2025
Close: Jan 13, 2026
Provide 2026 concrete repair projects and asphalt mill and overlay projects.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →