Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction area signs; 84 ton hot mix asphalt (type a); 620 SY cold plane asphalt concrete pavement; 49 CF rapid setting concrete (patch); 1,902 CF furnish polyester concrete overlay.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consist of approx 135.2 SY deck repair class A; 88 LF paving notch replacement; 39 SF concrete repair; 625.8 SY class o pcc deck overlay; 625.8 SY fiber reinforcement for concrete repair/overlay.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
The work consist of approx 135.2 SY deck repair class A; 88 LF paving notch replacement; 39 SF concrete repair; 625.8 SY class o pcc deck overlay; 625.8 SY fiber reinforcement for concrete repair/overlay.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
AvailableBridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →