Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 135.2 SY deck repair class A; 88 LF paving notch replacement; 39 SF concrete repair; 625.8 SY class o pcc deck overlay; 625.8 SY fiber reinforcement for concrete repair/overlay.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The work consist of approx 5,904 SY bridge floor overlay; 391 SY bridge floor repair; 1,829.10 SY longitudinal grooving in concrete; 1,200 LF temporary barrier rail.
Posted Date
Nov 18, 2025
Due Date
Feb 14, 2026
Release: Nov 18, 2025
Close: Feb 14, 2026
The work consist of approx 5,904 SY bridge floor overlay; 391 SY bridge floor repair; 1,829.10 SY longitudinal grooving in concrete; 1,200 LF temporary barrier rail.
AvailableWork includes approx. 2,091 SY bridge floor overlay, 553.80 CY excavation, 50 LF guardrail, 33.58 Station pavement markings.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 2,091 SY bridge floor overlay, 553.80 CY excavation, 50 LF guardrail, 33.58 Station pavement markings.
AvailableWork includes 1,469 SF thermoplastic pavement marking - line 4"; 290 sf modified urethane pavement marking - line 4"; 1,469 SF grooving for recessed pavement marking 5"; 9 EA. Guardrail reflectors, type c (special); 468 SY bridge deck scarification 3/4"; 468 sy bridge deck latex concrete overlay, 2 1/4"; 3 SF structural repair of concrete (depth equal to or less than 5 inches); 69 sy deck slab repair (full depth, type ii); 412.5 SF steel plate beam guardrail, type a, 6 foot posts.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 1,469 SF thermoplastic pavement marking - line 4"; 290 sf modified urethane pavement marking - line 4"; 1,469 SF grooving for recessed pavement marking 5"; 9 EA. Guardrail reflectors, type c (special); 468 SY bridge deck scarification 3/4"; 468 sy bridge deck latex concrete overlay, 2 1/4"; 3 SF structural repair of concrete (depth equal to or less than 5 inches); 69 sy deck slab repair (full depth, type ii); 412.5 SF steel plate beam guardrail, type a, 6 foot posts.
AvailableThe work consist of approx 607.8 SY deck repair; 1,899.5 SY fiber reinforcement for concrete repair/overlay; 535.9 class 13 waste excavation; 1,286.4 SY 9" hot mixed asphalt mixture paved shoulder; 332.9 SY bridge approach; 1,997.6 SY leveling or strengthening course wedge hot mixed asphalt mixture.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
The work consist of approx 607.8 SY deck repair; 1,899.5 SY fiber reinforcement for concrete repair/overlay; 535.9 class 13 waste excavation; 1,286.4 SY 9" hot mixed asphalt mixture paved shoulder; 332.9 SY bridge approach; 1,997.6 SY leveling or strengthening course wedge hot mixed asphalt mixture.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis