CityTX
Aug 18, 2026
Closes
Aug 25, 2026
Preventative Maintenance for Dairy Analyzers (Request for Quote)
Preventative maintenance for dairy analyzers. preventative maintenance for the FLM300 should include: Disassembling instrument components or panels; Inspecting internal electrical, mechanical, optical, pneumatic, and heating systems; Diagnosing instrument faults and error codes; Replacing internal parts such as sensors, boards, motors, pumps, probes, filters, lamps, tubing, seals, or wiring as needed Annual replacement of both excitation and emission filters. That is one of the clearest scheduled PM items in the FLM300 guide.; Fuse check/replacement when indicated, using the specified 5 x 20 mm, 250V, time-delay,1-Amp fuses. See outside link.