Retrieving RFP details
Release
Close
City of San Antonio
Provide requesting preventative maintenance and testing to existing electrical distribution equipment in addition to pricing for spare equipment.
Texas Department of Transportation
Provide preventive maintenance, inspection, and repair of centrifugal and packaged chilled water systems and associated equipment.
University Of North Carolina At Chapel Hill
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
University Of Alabama At Birmingham
This project involves the modification of the existing chilled water piping system serving imaging equipment within the radiology department. Work will include alterations to existing chilled water piping, installing additional chilled water piping, equipment, and related infrastructure to integrate into the existing system, and modifying HVAC controls serving this area of the building. The project will include general construction, fire protection, plumbing, mechanical, and electrical disciplines.
Clark County
Provide Chilled Water Pump, Chiller Valve & Condenser Water Strainer Replacement
Release
Dec 27, 2024
Close
Jan 24, 2025