CityCA
Posted
-
Nov 23, 2026
Annual Accessibility Ramps FY24
The work to be performed, in general, consists of furnishing all labor, tools, equipment, transportation, and materials required to complete the ANNUAL ACCESSIBILITY RAMPS – FY24 – Project Number 24-FF. The scope of work generally includes, but is not limited to the following: • PCC sidewalk and curb & gutter removal and replacement • ADA compliant accessibility ramp installation • removal and replacement of asphalt concrete pavement • setting up and maintaining temporary traffic control • installation of removed traffic striping • Additive Alternate ‘A’ – AT&T manhole adjustment Bids are required for the entire work described in the project plans, specifications, and contract documents, and must be submitted on the forms contained therein. Time for completion of the work is 20 WORKING DAYS for all work as described for the “base bid”.
