School DistrictWA
Posted
Nov 9, 2026
Dec 10, 2026
Districtwide Improvements, MACC 2 Bid Package Nos. 2A.2, 03A.2, 06B.2, 07A.2, 08A.2, 08D.2, 09A.2, et al
The NKSD, District wide Improvements project includes the addition of secure entry vestibules, site circulation improvements to support better site safety and accessibility improvements, a minor addition and light TI to support equitable facilities programming, and associated system improvements. Bid packages: BP 02A.2 - Demolition; BP 03A.2 - Structures; BP 06B.2 - Millwork/finish carpentry; BP 06A.2 - Roofing and sheet metal, 08A.2 - Interior openings; BP 08D.2 - Aluminum, gas and glazing; BP 09A.2 - Drywall; BP 09C.2 - Flooring, BP 09E.2 - Acoustical ceilings; BP 09G.2 - Paint and wall coverings; BP 10Z.2 - Misc specialties, BP 21.A.2 - Fire protection; BP 23L.2 - HVAC; BP 26A.2 - Electrical, BP 31A.2 - Earthwork and utilities; BP 31C.2 - Site improvements; BP 32C.2 - Landscaping and irrigation.
