CityWI
Jul 30, 2026
Closes
Aug 12, 2026
Alley pavement reconstruction, permeable pavers, storm drainage facilities, sidewalk and driveway approaches as necessary. RFP
Construction of 7 concrete alley pavement, variable thickness asphaltic concrete pavement, 7 concrete driveway, concrete curb and gutter, variable thickness concrete walk and/or concrete driveways, variable thickness crushed stone base, permeable pavers, sealing pavement joints and cracks, stone bedding, slurry backfill, concrete and other removals, sewer work, etc