Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Frisco, Texas is soliciting a Best Value Bid for its FY26 Alley Replacement Project to remove and replace concrete alley pavement and drive approaches at four alleys within the city. Bids are due by 2:00 PM Central on February 5, 2026, via the City’s Bonfire/Euna procurement portal. This is a single, stand-alone construction solicitation and not a grant program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work generally consists of mobilization, reconstruction of alley pavements with new PCC pavement section; sawcut, removal & disposal of existing improvements, reconstruction of damaged miscellaneous PCC curb, gutter, driveway & alley intersection improvements, notifications to businesses and residents; replacement of existing traffic striping, water quality BMP's, and implementing traffic control as required to complete the rehabilitation and construction of Alley
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
The scope of work generally consists of mobilization, reconstruction of alley pavements with new PCC pavement section; sawcut, removal & disposal of existing improvements, reconstruction of damaged miscellaneous PCC curb, gutter, driveway & alley intersection improvements, notifications to businesses and residents; replacement of existing traffic striping, water quality BMP's, and implementing traffic control as required to complete the rehabilitation and construction of Alley
AvailableThe City of Allen Park is soliciting bids to replace sanitary sewer infrastructure within the alley bounded by Ecorse/Berkshire and Kolb/Cortland. The work will include sewer replacement and related restoration in the specified alley limits. Bids are due via the MITN/BidNet system by 3:00 PM EST on February 19, 2026.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
The City of Allen Park is soliciting bids to replace sanitary sewer infrastructure within the alley bounded by Ecorse/Berkshire and Kolb/Cortland. The work will include sewer replacement and related restoration in the specified alley limits. Bids are due via the MITN/BidNet system by 3:00 PM EST on February 19, 2026.
AvailableWork includes 400 LF of sawing (concrete); 50 LF of curb and gutter; 250 SY 6" concrete alley; 20 SY restoration (mulch).
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
Work includes 400 LF of sawing (concrete); 50 LF of curb and gutter; 250 SY 6" concrete alley; 20 SY restoration (mulch).
AvailableThe RFP is for construction services for the 18th Street Sewer Improvements at Alley, including removing and replacing an existing sewer line, providing temporary sewer bypass, and restoring trench repairs.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
The RFP is for construction services for the 18th Street Sewer Improvements at Alley, including removing and replacing an existing sewer line, providing temporary sewer bypass, and restoring trench repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →