Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 4 EA of connect new pipe to existing lateral; 8 ea of standard 48' dia manhole, 8". Depth. Includes frame, cover, pipe, connections, and appurtenances. Complete in place; 2 VF of extra depth 48" diameter precast concrete manhole; 1 EA of standard 60" dia manhole, 8' Depth. Includes frame, cover, pipe, connections, and appurtenances. Complete in place; 5 VF of extra depth 60" dia precast concrete manhole. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
The project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
AvailableGamma Avenue Water Main Replacement.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Gamma Avenue Water Main Replacement.
AvailableGamma Avenue Water Main Replacement.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Gamma Avenue Water Main Replacement.
AvailableRequest for bids for roof replacement services at 4202 23rd Avenue.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Request for bids for roof replacement services at 4202 23rd Avenue.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →