CountyOR
Posted
Aug 14, 2026
Sep 15, 2026
Buxton Road Pedestrian Improvements
Construction of ADA ramps, drainage and signing includes 600 LF asphalt pavement saw cutting 6" to 14" deep, 39 LF 12" storm sewer pipe 5 FT depth, 9 LF 10" ductile iron pipe 5 FT depth, 1 EA concrete storm sewer manholes, 24 LF 6" ductile iron pipe with class B backfill.