Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The San Juan Water District is soliciting consulting engineering services to investigate, design, and provide bidding and construction support for an Air Release Valve Replacement Program that will replace approximately 45 valves per year over a three-year program and evaluate up to 60 valves each year. The consultant will perform investigation and evaluation, prepare preliminary and final design plans and specifications, and provide bidding and construction support services. The solicitation is open for proposals from 2026-01-05 through 2026-02-04 and includes a mandatory pre-bid meeting on 2026-01-15.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
The purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
AvailableThis phased project involves replacing valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
This phased project involves replacing valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
AvailableAir handler replacement services.
Posted Date
Jan 8, 2026
Due Date
Jan 16, 2026
Release: Jan 8, 2026
Close: Jan 16, 2026
Air handler replacement services.
AvailableProvide air filter replacement services.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Provide air filter replacement services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis