Special DistrictMA
Aug 3, 2026
Closes
Aug 21, 2026
Zone Valve Replacement
Work consist of replace all malfunctioning baseboard zone valves in 80 residential units at ann whalen development and upgrade thermostats as required.
Description: Repairing one (1) broken valve on the primary anaerobic digester and removing two (2) broken valves on the secondary anaerobic digester and replacing them with one (1) new valve and 6-FT diameter manhole.
City · SC, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Special DistrictMA
Aug 3, 2026
Closes
Aug 21, 2026
Work consist of replace all malfunctioning baseboard zone valves in 80 residential units at ann whalen development and upgrade thermostats as required.
Fox River Water Reclamation District
Special DistrictIL
Jul 17, 2026
Closes
Aug 12, 2026
Project consists of the installation of owner-provided tube-in-tube heat exchangers and the construction of connecting piping, instrumentation, and controls, and the cleaning, cctv, and repairs of the basement floor drain.
Washington Suburban Sanitary Commission
Special DistrictMD
Jun 22, 2026
Closes
Aug 19, 2026
This project involves replacement of approximately 87' of 30" water main, 48' 72" water main, and one (1) 30" Valve and Vault.
Special DistrictMA
Jul 22, 2026
Closes
Aug 20, 2026
Project consists of but not limited to: Replacement of isolation valves, fixture stops, and riser tubes.
Procurement and program contacts connected to City of Anderson.