Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The vendor shall include all costs for this requirement to include but not limited to overhead, materials, packaging, shipping and offloading of materials. The contractor must provide the required filters and belts that meet or exceed the specifications for each filter and belt described under the specifications section of this document. MERV 9 Pleated Pre-Filter Specifications: Pressure Drop resistance 0.38” W.G. for 1” deep, 0.22” W.G. for 2” deep, and 0.17” W.G. for 4” deep filters at 2000CFM and 500 FPM operating resistance. Frame construction will consist of a die cut box beverage board frame with double thickness in the perimeter wall. A heavy-duty galvanized metal pleat support grid laminated to the media for rigidity and to maintain pleat spacing. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide an air handling unit replacement.
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Provide an air handling unit replacement.
AvailableAir handling unit (AHU) replacement.
Posted Date
Jan 14, 2026
Due Date
Feb 20, 2026
Release: Jan 14, 2026
Close: Feb 20, 2026
Air handling unit (AHU) replacement.
AvailableThe existing multi-zone air handling unit (AHU) and condensing unit serving cottage of the intermediate care facility is to be replaced with new single-zone split systems. The existing mechanical pit is to be expanded to accommodate the new HVAC equipment. The existing switch and fuse distribution panelboard serving the HVAC equipment is to be replaced with a new circuit breaker distribution panelboard.
Posted Date
Oct 29, 2025
Due Date
Feb 5, 2026
Release: Oct 29, 2025
Close: Feb 5, 2026
The existing multi-zone air handling unit (AHU) and condensing unit serving cottage of the intermediate care facility is to be replaced with new single-zone split systems. The existing mechanical pit is to be expanded to accommodate the new HVAC equipment. The existing switch and fuse distribution panelboard serving the HVAC equipment is to be replaced with a new circuit breaker distribution panelboard.
CREC is soliciting quotes to replace the air handling unit at River Street School, including removal of the existing 35-year-old motor/blower assembly and installation of a new high‑efficiency fan array with redundancy. The contractor must provide electrical connections, controls, testing and balancing, commissioning, training, and warranty documentation while maintaining airflow during school hours and scheduling work after hours. The procurement was posted on December 8, 2025 and is due January 30, 2026 at 9:00 AM ET.
Posted Date
Dec 8, 2025
Due Date
Jan 30, 2026
Release: Dec 8, 2025
Close: Jan 30, 2026
CREC is soliciting quotes to replace the air handling unit at River Street School, including removal of the existing 35-year-old motor/blower assembly and installation of a new high‑efficiency fan array with redundancy. The contractor must provide electrical connections, controls, testing and balancing, commissioning, training, and warranty documentation while maintaining airflow during school hours and scheduling work after hours. The procurement was posted on December 8, 2025 and is due January 30, 2026 at 9:00 AM ET.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis