University Of Alabama At Birmingham
Higher EducationAL
Posted
-
Nov 19, 2026
PREQUALIFICATION AND ADVERTISEMENT FOR BIDS
Classroom renovations for UAB Project No. 240444 - UAB LRC Classrooms 210, 215, 219, 235, and 249.
Description: Timpanogos Sanitary Sewer District (TSSD) is requesting Statements of Qualification/Bidder Prequalification Applications from general contractors for construction of capital improvement projects under $20M in the collection system, including large diameter pipelines.
SpecialDistrict · UT, US
Adjacent opportunities open for bidding right now.
University Of Alabama At Birmingham
Higher EducationAL
Posted
-
Nov 19, 2026
Classroom renovations for UAB Project No. 240444 - UAB LRC Classrooms 210, 215, 219, 235, and 249.
University Of California At Los Angeles
Higher EducationCA
Posted
Oct 22, 2026
Nov 5, 2026
Prequalification of prime contractors for the renovation of approximately 11,985 gsf of office space at the Gayley Center to establish a Real Time Safety Center for UCLA.
University Of California At Los Angeles
Higher EducationCA
Posted
Oct 21, 2026
Nov 5, 2026
Prequalification of prime contractors for the installation of a new high-efficiency electric centrifugal chiller and associated infrastructure at the University of California, Los Angeles Cogeneration Plant.
Posted
Oct 27, 2026
Dec 21, 2026
Intends to pre-qualify multiple consultants for each of the service categories listed in this solicitation. The goal is to establish a diverse, pre-qualified pool of consultants to provide professional services.
Decision makers connected to this RFP from Timpanogos Special Service District.
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
325 days before RFP
TSSD’s recommended 10-year capital plan proposed collection-system capacity and rehabilitation projects with construction periods from 2025 through 2029 and listed project costs.
RECOMMENDED 10-YEAR CAPITAL IMPROVEMENT PROGRAM Based on the system improvements identified in Chapter 6 and the recommended prioritization approach discussed above, Table 7-2 lists improvement projects that are recommended within the next 10-years, the budget required to complete those projects, and the recommended timing of those projects. For budgeting…
Timpanogos Special Service District Capital Facilities Plan
Capital improvement plan · Dec 1, 2025
Agenda packet
35 days before RFP
TSSD reported that the CL-R2 outfall replacement was design-complete, with bidding shifted to spring and a contractor-prequalification document being finalized for smaller projects.
T S S D CL-R2 \| Project Status Design complete. Bid timing shifted to spring. 1 DESIGN COMPLETE Final plans are complete and the project is ready for bidding. 2 BIDDING MOVED TO SPRING TSSD chose spring bidding to avoid temporary paving or maintaining road base through the winter. 3 REDUCED COMMUNITY IMPACTS Spring construction reduces overlap with school…
Timpanogos Sanitary Sewer District Administrative Board Retreat
Agenda packet · Sep 17, 2026
Board meeting
35 days before RFP
TSSD's engineers reported that the proposed Dry Creek Lift Station project would double capacity with four new pumps and related electrical and controls work, with bidding hoped for in late 2026 or early 2027.
1 Timpanogos Sanitary Sewer District APPROVED 3 Administrative Board Retreat Minutes 2 6400 North 5050 West Utah County, Utah 4 5 September 17, 2026 8:00 a.m. Conference Room 6 7 Board Members: 8 Present: \*Chandler Goodwin - Chair \*Mark Christensen - Vice Chair 9 Dave Norman Brian Braithwaite 10 David Bunker Mack Straw 11 \*Neal Winterton Brian Voeks 12…
Agenda packet
35 days before RFP
TSSD reported that the $12,684,450 SR-2 54-inch RCP rehabilitation project was pushed back until after Saratoga Springs roadway construction.
SR-2 Structural Rehab of 54" • 2026 IFFP Amendment - $12,684450 • 2025 CFP/IFFP - $12,315,000 • 2025 CFP had estimated Construction at 2026-2027 • Saratoga Springs is currently under Construction on a roadway project along the alignment of the 54" • SR-2 is pushed back until after the completion of the Saratoga Roadway project to avoid conflicts during…
Timpanogos Sanitary Sewer District Administrative Board Retreat
Agenda packet · Sep 17, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (20 days left)
Timpanogos Sanitary Sewer District Administrative Board Retreat Minutes
Board meeting · Sep 17, 2026
DRY CREEK LIFT STATION IMPROVEMENTS (LS-3) Status: • 90% design is completed. -- Replacing 3 existing pumps with 4 new pumps -- Replacing all electrical and controls -- Replacing existing generator -- Adding odor control and new HVAC -- Add new electrical room and pump station access • Coordinating final details including -- Protection of emergency…
Timpanogos Sanitary Sewer District Administrative Board Retreat
Agenda packet · Sep 17, 2026