CityNM
Posted
Aug 24, 2026
Oct 15, 2026
Bloomfield WRF Site Improvements 2026 (Advertisement for Bids)
Work includes wrf site improvements to include 1) conversion of existing north clarifier into toxic/eq tank including flow controls with electric motorized valves and magnetic flow meter, 2) demolition of old treatment structure - aeration/digester basin and south clarifier including piping termination within 5 feet of the structure and associated electrical terminations, 3) construct a gravity drain from the plant drain lift station to the headworks and remove the pumps and controls from the lift station, 4) miscellaneous yard piping, valve, and cleanout repairs, 5) miscellaneous drying bed concrete repairs, 6) miscellaneous grating repairs at sbr and ccc, and 7) miscellaneous repairs at the operations building.