CityMN
Posted
Oct 13, 2026
Nov 5, 2026
Lift Station #53 Rehabilitation RFP
Lift station #53 rehabilitation.
Description: Project consists of furnishing all labor, materials, equipment, tools, transportation, supervision, and incidentals required to demolish the existing sanitary sewer pump station and construct a new 400 gpm duplex submersible pump station, including installation of a fiberglass (frp) wet well extension atop the existing concrete wet well, a new frp valve pit, associated site and process piping, electrical and control systems, and a passive odor control unit. Work shall include demolition and removal of existing pumps, piping, valves, electrical components, fencing, and site improvements as necessary; relocation and reinstallation of the existing metal (wrought-iron type) fence; removal and replacement of asphalt paving and concrete pads; bypass pumping during construction; dewatering; erosion, sediment, and traffic control; site grading and restoration; testing; startup; and all incidental work.
County · LA, US
From the first pre-RFP signals to the published RFP and its files.
Proposed budget
Jefferson Parish executed a 2017 Clean Water State Revolving Fund loan to fund improvements to a number of Parish lift stations.
In 2017, the Parish executed a loan agreement with the Louisiana Department of Environmental Quality (Clean Water State Revolving Fund) in the amount of $20,000,000 to provide funds for improvements to the Marrero Wastewater Treatment Plant, as well as improvements to a number of lift stations located in the Parish. The Louisiana Department of Environmental…
Jefferson Parish FY2026 Proposed Budget
Proposed budget · 2025
Proposed budget
Jefferson Parish executed a 2013 Clean Water State Revolving Fund loan to fund replacement or upgrades at several existing sewerage lift stations.
In 2013, the Parish executed a loan agreement with the Louisiana Department of Environmental Quality (Clean Water State Revolving Fund) in the amount of $15,250,000 to provide funds for the replacement and/or upgrade to several existing Sewerage lift 2026 JEFFERSON PARISH 309 ANNUAL BUDGET stations. The Louisiana Department of Environmental Quality loan is…
Jefferson Parish FY2026 Proposed Budget
Proposed budget · 2025
Proposed budget
Jefferson Parish issued 2019B bonds to fund sewer projects including construction, improvement and maintenance of pumping stations.
BUDGET # 39430 (SPECIAL TAX BONDS) PURPOSE OF DEBT ISSUE The 2019B bonds were issued to provide funding for the purpose of purchasing, constructing, acquiring and improving sewer project and to construct, improve and maintain public roads, streets or highways located in the Parish, including the costs of reconstruction, rehabilitation, base stabilization,…
Jefferson Parish FY2026 Proposed Budget
Proposed budget · 2025
Meeting agenda
91 days before RFP
The agenda proposed selecting qualified firms for parish-wide routine sewer engineering services for assignments up to $500,000 over a two-year period.
Resolution #148748 - selecting from persons or firms interested and qualified to provide routine engineering services for Sewer Projects for a fee of $500,000.00, or less, per assignment, excluding any fee for resident inspection services, for a two-year period beginning the date this resolution selecting consultants to perform engineering services is…
Jefferson Parish Council Council Meeting
Meeting agenda · Jul 22, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (34 days left)
Decision makers connected to this RFP from Jefferson Parish.
Adjacent opportunities open for bidding right now.
CityMN
Posted
Oct 13, 2026
Nov 5, 2026
Lift station #53 rehabilitation.
CityFL
Posted
Nov 2, 2026
Dec 2, 2026
Worl includes approx 434 SY milling and resurfacing; 1 LS furnish and install precast concrete wet well; 99 LF of 12" PVC gravity sewer.
CountyNC
Posted
Oct 2, 2026
Nov 12, 2026
Project generally consists of the rehabilitation of the Granville business park sewage lift station, which includes, but is not limited to the replacement of submersible pumps and appurtenances, relining of the lift station well, rebuilding of any valves which are deemed necessary, replacement and installation of the generator and all electrical components in the controls building, vaults, and wells, and testing of all gravity sewer and force mains for certification, as shown in the design plans.
Special DistrictTN
Posted
Oct 28, 2026
Nov 17, 2026
Work includes approx. of 1,244 LF of 15" pipe lining, CIPP; 1680 LF of 18" pipe lining, CIPP (apply steam, hot water, or ultraviolet (UV) light); 643 LF of 20" pipe bursting; 150 LF of 18" pipe bursting; 110 VF 4' manhole lining, 1" thick cementitious lining; 50 LF 15-24" storm sewer replacement; 50 LF 30-48" storm sewer replacement.