ADVERTISEMENT FOR BID – Addison School District 4 2027 Capital Improvements
Description: Addison School District 4 is soliciting sealed lump-sum bids for its 2027 Capital Improvements, which will be publicly opened at the stated deadline. A non-mandatory pre-bid conference is scheduled for November 12, 2026, and electronic bidding documents are to be made available through International Contractors, Inc. on or after November 4, 2026. Each bid must include a bid bond equal to 10% of the base bid and comply with Illinois prevailing-wage and equal-employment requirements.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Work includes a heavy interior remodel of science labs, a partial roof replacement and a partial roof replacement and outdoor chiller replacement work.
Improvements to the Joe Walker and Tricia Asselin softball fields, including infield grading, drainage, clay and infield mix installation, and related field work.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
167 days before RFP
The Buildings and Grounds Committee recorded planned Summer 2027 rooftop HVAC work and an approximately $6.2 million fire-alarm replacement project.
See sourceHide source
Summer 2027 Construction Planning ● Planned work includes four rooftop units in the gym east hallway and two rooftop units in the north and west hallways. ● Supply and return systems will be installed on the roof. ● The district will also complete a fire alarm replacement project at a cost of approximately $6.2 million.
Addison School District 4 Buildings And Grounds Committee Meeting
The Board approved Legat Architects' contract for Summer 2027 construction work covering Ardmore HVAC and fire-alarm improvements.
See sourceHide source
we have approval of an architect contract for summer 2027 construction, Dr. Morgese. Okay. With the input and the guidance of the buildings and grounds committee, the summer 2027 2027 project and scope was developed. The details are included and attached in your documents in the board packet. It will include HVAC and a fire alarm system at Ardmore. This…
The Board approved Summer 2027 Army Trail construction work including part of the HVAC-system replacement programme.
See sourceHide source
>> And our last action item for tonight is approval of the 2027 construction. Dr. Moresy. >> Thank you. Um in your board packet with the input and guidance of the buildings and grounds committee. The summer 2027 construction project scope has changed. The details are included in attached documents for your review and include part of the HVAC system for Army…
Board of Education Board of Education Meeting
Board meeting · Aug 19, 2026
Agenda packet
41 days before RFP
The Board approved issuance of up to $19,965,000 in general-obligation bonds for school reconstruction and fire-safety, energy-conservation, and security equipment.
See sourceHide source
BOARD OF EDUCATION REGULAR MEETING MINUTES Wednesday, September 16, 2026 Indian Trail Junior High School 1. CALL TO ORDER & PLEDGE OF ALLEGIANCE The regular meeting of the Board of Education of Addison School District 4 was called to order by Board President Chris Bollig. President Bollig led the Pledge of Allegiance. 2. ROLL CALL Present: ● Bollig,…
RFP published