Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
A new advanced in-dispenser fleet fueling control systems. The scope of work consist of the removal of the existing fuel systems at the locations, disposal of the existing system, and a turnkey installation for the new fuel system to include all required work necessary for the system to be functional upon completion of the installation to include owner training. The systm will be a Wayne IX fleet fuel control system or approved equal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
furnish an Advanced Metering Infrastructure (AMI) system for its water utility.
Posted Date
Nov 20, 2025
Due Date
Dec 31, 2025
Release: Nov 20, 2025
Close: Dec 31, 2025
furnish an Advanced Metering Infrastructure (AMI) system for its water utility.
AvailableThis RFP is for the procurement and implementation of an Advanced Metering Infrastructure (AMI) system to convert meters in Phase 1 to an AMI system.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
This RFP is for the procurement and implementation of an Advanced Metering Infrastructure (AMI) system to convert meters in Phase 1 to an AMI system.
AvailableSeeks to implement an Advanced Metering Infrastructure (AMI) system. The AMI system will provide reliable data collection, outage management, leak detection, and integration with the City’s Tyler Technologies/Sensus Encode billing software.
Posted Date
-
Due Date
Jan 9, 2026
Close: Jan 9, 2026
Seeks to implement an Advanced Metering Infrastructure (AMI) system. The AMI system will provide reliable data collection, outage management, leak detection, and integration with the City’s Tyler Technologies/Sensus Encode billing software.
AvailableDesign-build and long-term maintenance services for the replacement of existing unleaded gasoline infrastructure and diesel dispenser replacement furnish all labor, materials, equipment, permits, engineering, testing, disposal, commissioning, and long-term facility maintenance necessary to deliver a fully operational, code-compliant fuel dispensing system. Due to regulatory complexity and ongoing operational needs, the city requires a contractor capable of maintaining uninterrupted fueling operations during assessment, permitting, and construction activities, while prioritizing safety, regulatory compliance, and minimizing risks to municipal fleet services, including emergency response units. Complete project information and a description of required services is located in section two.
Posted Date
Dec 9, 2025
Due Date
Jan 26, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build and long-term maintenance services for the replacement of existing unleaded gasoline infrastructure and diesel dispenser replacement furnish all labor, materials, equipment, permits, engineering, testing, disposal, commissioning, and long-term facility maintenance necessary to deliver a fully operational, code-compliant fuel dispensing system. Due to regulatory complexity and ongoing operational needs, the city requires a contractor capable of maintaining uninterrupted fueling operations during assessment, permitting, and construction activities, while prioritizing safety, regulatory compliance, and minimizing risks to municipal fleet services, including emergency response units. Complete project information and a description of required services is located in section two.
Available