Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Spring & Cow Creek Sanitary District
furnish an Advanced Metering Infrastructure (AMI) system for its water utility.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Hingham
Water utility advanced metering infrastructure system.
Posted Date
Sep 29, 2025
Due Date
Dec 9, 2025
Release: Sep 29, 2025
Town of Hingham
Close: Dec 9, 2025
Water utility advanced metering infrastructure system.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Los Angeles
Advanced metering infrastructure implementation program.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
City of Los Angeles
Close: Jan 15, 2026
Advanced metering infrastructure implementation program.
AvailableCity of Akron
Project is for the installation of advanced metering infrastructure on private properties at many, 3,300 plus or minus, locations and includes miu radio relocations at an additional 3,000 plus or minus, locations that also includes concrete driveway reconstruction, 6 inches thick; asphalt concrete surface course, type 1, 4 inches thick, driveway reconstruction; 3,307 EA metering infrastructure installation 5/8"-1"; 16 EA metering infrastructure installation 5/8"-1" in curb meter pit. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
City of Akron
Close: Dec 18, 2025
Project is for the installation of advanced metering infrastructure on private properties at many, 3,300 plus or minus, locations and includes miu radio relocations at an additional 3,000 plus or minus, locations that also includes concrete driveway reconstruction, 6 inches thick; asphalt concrete surface course, type 1, 4 inches thick, driveway reconstruction; 3,307 EA metering infrastructure installation 5/8"-1"; 16 EA metering infrastructure installation 5/8"-1" in curb meter pit. See attached file.
AvailableCity of Republic
The City of Republic (MO) requests proposals for Advanced Metering Infrastructure (AMI) labor services including site survey, design, installation of roughly 8,000 Itron cellular AMI endpoints, supplying/setting 4,000 new Diehl meters and retrofitting 4,000 meters with Itron connectors, plus system integration and training. The work is planned as a ~12-month project and requires demonstrable AMI installation experience and inventory/data management.
Posted Date
Nov 19, 2025
Due Date
Dec 11, 2025
Release: Nov 19, 2025
City of Republic
Close: Dec 11, 2025
The City of Republic (MO) requests proposals for Advanced Metering Infrastructure (AMI) labor services including site survey, design, installation of roughly 8,000 Itron cellular AMI endpoints, supplying/setting 4,000 new Diehl meters and retrofitting 4,000 meters with Itron connectors, plus system integration and training. The work is planned as a ~12-month project and requires demonstrable AMI installation experience and inventory/data management.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →