CityMO
Aug 5, 2026
Closes
Aug 18, 2026
Remove and Replace of Inverter Pump Duty Motor RFP
Work includes remove and replace, 1 each of inverter pump duty motor, 50HP, 3HP, 1800RPM, 400V.
Description: Pump Controller Replacement: Safely remove the existing sewer pump controller and furnish/install a new controller and floats that restores reliable automatic operation, protects pumps, and integrates with existing pump system. Perform a comprehensive annual preventative maintenance service on the lift station, interior tank cleaning, associated pumps, valves, level-sensing devices, wiring, and panels to reduce failure risk and verify system performance. See attached file.
Federal · MA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
CityMO
Aug 5, 2026
Closes
Aug 18, 2026
Work includes remove and replace, 1 each of inverter pump duty motor, 50HP, 3HP, 1800RPM, 400V.
CityNJ
Aug 5, 2026
Closes
Sep 2, 2026
Rehabilitation of the existing sanitary sewer pump station, including but not limited to: site preparation and selective demolition; temporary bypass pumping; soil erosion and sediment control; furnishing and installing new submersible wet well pumps, variable frequency drives, guide rail system, and appurtenant hardware; furnishing and installing a new grinder unit, rail system, and control panel; furnishing and installing a new above-grade duplex valve vault complete with valves, access hatch, davit crane, bypass connection, flow meter, and controls; demolition and decommissioning of the existing dry well; new yard piping; furnishing and installing all electrical wiring, components, equipment, and appurtenances; removal and disposal of an existing underground propane tank, including permitting; and site restoration including surface restoration, fencing, and bollards.
CityCA
-
Closes
Aug 24, 2026
Procurement of primary sludge pump controller upgrade services for the Wastewater Treatment Plant.
Texas Department of Transportation
State AgencyTX
Aug 12, 2026
Closes
Aug 26, 2026
A contract ATC cabinet with controller.
Procurement and program contacts connected to NER Services MABO (43000).