Installation of Sidewalk on Henry Street RFP
Project consists of installation of approximately 200 L.F. of sidewalk, as well as, associated work.
Description: Work includes approx 597 LF of 18" RCP Class 3 F&I; 10 LF of 15" RCP Class 3 F&I; 34 LF of 18" ARCH RCP Class 3 F&I; 1 LF of 18" ARCh RCP flared end section F&I; 641 LF of granular material for storm sewer; 560 SF of 6" PCCP fillet section; 44 LF of concrete curb & gutter (B66); 275 SF of 6" approach pavement; 26,009 SF of 6" sidewalk; 140 SF of detectable warning panel; 150 LF of saw existing concrete; 70 LF of saw existing asphalt.
City · SD, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Yankton.
Adjacent opportunities open for bidding right now.
CityNY
Jul 21, 2026
Closes
Aug 12, 2026
Project consists of installation of approximately 200 L.F. of sidewalk, as well as, associated work.
CityNY
Jul 21, 2026
Closes
Aug 12, 2026
The Town of Greenburgh is soliciting bids for approximately 350 linear feet of new sidewalk and associated work along Henry Street. The open construction procurement includes a pre-bid meeting on July 29, 2026, and lists related plan, bid book, and notice-to-bidders documents. Bids are due August 12, 2026, at 2:00 PM local time, and the solicitation is not a grant program.
CityNY
Jul 21, 2026
Closes
Aug 12, 2026
The Town of Greenburgh is soliciting bids for approximately 350 linear feet of new sidewalk and associated work along Henry Street. The open construction procurement includes a pre-bid meeting on July 29, 2026, and lists related plan, bid book, and notice-to-bidders documents. Bids are due August 12, 2026, at 2:00 PM local time, and the solicitation is not a grant program.
CountyFL
Jun 30, 2026
Closes
Aug 6, 2026
Work includes prevention, control and abatement of erosion and water pollution 1 ls, clearing and grubbing 1 ls, mailbox, f&i, single 19 ea, earthwork (excavation, embankment, and grading) 1 ls, milling existing asphalt pavement (1" avg. Depth) 224 sy, superpave asphaltic concrete (traffic c) (1") 224 sy, see outside link.