Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of engineering services for the planning, design, and construction support to replace the existing Real Time Products Corp. Input/Output (RTP I/O) subsystem and remove associated process equipment local controls in Area Control Center-1 (ACC-1) at the EchoWater Facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableProcurement of critical spare parts for the REO Fire Protection Subsystem, including various gauges, valves, transformers, regulators, transmitters, manifolds, and inspection services.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
Procurement of critical spare parts for the REO Fire Protection Subsystem, including various gauges, valves, transformers, regulators, transmitters, manifolds, and inspection services.
AvailableThe project includes a new vertical lift bridge and removal of a number of structurally deficient or functionally obsolete bridges that have reached the limit of their design life. Approximately 500 feet of Bercut Drive will be modified from Railyards Boulevard to have 2 northbound lanes tapered down to one northbound and one southbound lane. Jibboom Street will be modified to have one traveled lane in each direction, a class II bike lane, sidewalk and retaining walls. Railyards Boulevard will extend to the west to the new bridge and over the Sacramento River and will include two westbound lanes with one eastbound lane. The new profile of Railyards Boulevard would be raised to meet CVFPB clearance requirements.
Posted Date
Dec 19, 2025
Due Date
Feb 18, 2026
Release: Dec 19, 2025
Close: Feb 18, 2026
The project includes a new vertical lift bridge and removal of a number of structurally deficient or functionally obsolete bridges that have reached the limit of their design life. Approximately 500 feet of Bercut Drive will be modified from Railyards Boulevard to have 2 northbound lanes tapered down to one northbound and one southbound lane. Jibboom Street will be modified to have one traveled lane in each direction, a class II bike lane, sidewalk and retaining walls. Railyards Boulevard will extend to the west to the new bridge and over the Sacramento River and will include two westbound lanes with one eastbound lane. The new profile of Railyards Boulevard would be raised to meet CVFPB clearance requirements.
AvailableWork includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis