Nevada Department of Administration
State AgencyNV
Posted
Nov 10, 2026
Dec 7, 2026
Clean Water Technical Assistance RFP
Qualified vendors to provide well repair services. The goal and objective is to secure services to fix the well and restore/repair services to the well meter so that NYTC can accurately provide the required reporting of water usage. Replace 4inch water main, meter and check valve at NYTC Well house: Replace 4” Ductile Iron from 4” Romac coupling and install new 4” MJ coupling and C-900 DR-14 pipe into concrete vault; Replace 4” Flanged Water Meter; Install 4” C-900 DR-14 with 4” x 1” saddle tap/1” Ball Valve and 1” Air Vent with associated 1” pipe nipples; Install 4” C-900 DR-14 with 2nd 4” x 1” saddle tap/pipe nipple and ball valve for sampling port; Install 4” Silent Check Valve inside vault; Install 3rd 4” x 1” saddle tap/1” SCH 80 pipe nipple and 1” SCH 80 ball valve for chlorine injection after check valve inside vault. Install 4” C-900 DR-14 from check valve to existing pipe with new 4” MJ coupling outside of the vault; Fully seal vault penetrations; Perform water leak test; Shade all pipe with sand, backfill and compact all ditches and reset valve boxes; Equipment to be provided by the contractor; Remove all debris from job site.
