Maryland Department of Transportation
State AgencyMD
Posted
-
Sep 24, 2026
MD 2 (Gov Ritchie Hwy) from MD 177 (Mountain Rd) to MD 648 (Balto Annapolis Blvd)
Roadway and pedestrian improvements. Construction of new 10-foot-wide separated shared use path for an approximate total length of 1.1 miles, reconstruction of approximately 2.1 miles of existing pavement shoulder/outside lanes to convert to 10-foot-wide separated street-level shared use paths, realignment of Amberly Road/Eastway access to northbound MD 2, reconstruction of existing traffic signals, upgrading existing traffic signals to comply with the latest accessible pedestrian signal (APS)/countdown pedestrian signal (CPS) standards, reconstruction of existing sidewalk to be Americans with Disabilities Act (ADA) compliant, construction and reconstruction of ADA-compliant curb ramps, installation of crosswalks at street intersections and select driveway locations, construction and reconstruction of curb and gutter, reconstruction of commercial entrances and residential entrances and driveways, construction of concrete moment slabs over box culvert crossings to meet Manual for Assessing Safety Hardware (MASH) compliance requirements, upgrading existing bus stops to be ADA compliant, relocation of existing Maryland Transit Administration (MTA) bus stops, excavation and grading, fine milling and pavement resurfacing, furnishing and installation of signing and pavement markings, construction and reconstruction of storm drain (SD) inlets, pipes, manholes, and structures, construction of new stormwater management facilities, installation of erosion and sediment control measures, installation of landscape items, maintenance of traffic, landscape work