Maryland Department of Transportation
State AgencyMD
Posted
Sep 8, 2026
Oct 15, 2026
IS-195 (Metropolitan Boulevard) from the MD 295 Interchange to the Baltimore County Line Slope Protection
Work includes includes slope stabilization measures to address slope erosion; install intercepting side ditches (intercept swales with a clay core) to capture roadway runoff, prevent seepage, and direct drainage to stable outfalls; construct new outfalls and repair an existing damaged outfall to improve the drainage system; stabilize larger eroded slopes using geotextile inclusions with embankment borrow; repair smaller erosion rills using fiber rolls with embankment borrow; installing compliant traffic barriers and end treatments.