Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of 2,100 LF of 108" diameter storm sewer. This includes the construction of the launch shaft and the receiving shaft. Construction of structures within the receiving shaft to connect the 108" storm sewer, including a dynamic underflow control system. Modification of components within McLean Avenue Sewer upstream of the bulkhead, including removal of the CSO 431 tide gate, removal of the CSO 666 bulkhead, and modifications of CSO diversion dams.Cleaning, inspecting, and lining tSewer from point of connection of the 108" storm sewer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Los Angeles (Public Works, Engineering Bureau) is soliciting consultant design services to rehabilitate and reconstruct the 2nd Street Tunnel, including environmental review and preparation of 100% plans, specifications, and estimates (PS&E). The work includes project management, stakeholder coordination, environmental documentation, preparation of construction documents, bid/award support, and potential identification of grant funding; the project duration is estimated at about 24 months.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Premium
Access the largest public sector contact database
The City of Los Angeles (Public Works, Engineering Bureau) is soliciting consultant design services to rehabilitate and reconstruct the 2nd Street Tunnel, including environmental review and preparation of 100% plans, specifications, and estimates (PS&E). The work includes project management, stakeholder coordination, environmental documentation, preparation of construction documents, bid/award support, and potential identification of grant funding; the project duration is estimated at about 24 months.
Release: Nov 26, 2025
Close: Jan 7, 2026
Work includes extension of street.
AvailableProject generally includes the construction of a public roadway for approx. 400 feet. The Project will connect existing roadway between East Street and Hillcrest Drive with full-depth HMA pavement, curb and gutter, angled parking, storm sewers, multi-use path, sidewalk, curb ramps, pavement markings, and signing.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Project generally includes the construction of a public roadway for approx. 400 feet. The Project will connect existing roadway between East Street and Hillcrest Drive with full-depth HMA pavement, curb and gutter, angled parking, storm sewers, multi-use path, sidewalk, curb ramps, pavement markings, and signing.
AvailableTunnel grouting services.
Posted Date
May 11, 2025
Due Date
Jan 12, 2026
Release: May 11, 2025
Close: Jan 12, 2026
Tunnel grouting services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis