Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide street streetscape.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of construction services for the Downtown Streetscape Main Street 2026 project.
Posted Date
-
Due Date
Dec 12, 2025
Release: -
Close: Dec 12, 2025
Procurement of construction services for the Downtown Streetscape Main Street 2026 project.
Premium
Access the largest public sector contact database
Work includes 56 unit tree removal; 3 EA inlet and pipe protection; 7,626 SF portland cement concrete sidewalk, 4"; 990 SY aggregate base course, type b 4"; 20 SF detectable warnings; 123 LF combination curb and gutter removal; 90 LF planter curb; 7,875 sf sidewalk removal; 73 SY 10 driveway removal; 6 SY pavement removal; 123 LF combination concrete curb and gutter, type m-6. 18 (modified); 188 LF telescoping steel sign support; 31 SF sign panel, type 1; 4 EA removing and resetting street signs; 2 EA remove and relocate trash receptacle; 3 EA bike rack removal; 1,194 SF stamped, colored portland cement concrete sidewalk, 4". See attached file.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
Work includes 56 unit tree removal; 3 EA inlet and pipe protection; 7,626 SF portland cement concrete sidewalk, 4"; 990 SY aggregate base course, type b 4"; 20 SF detectable warnings; 123 LF combination curb and gutter removal; 90 LF planter curb; 7,875 sf sidewalk removal; 73 SY 10 driveway removal; 6 SY pavement removal; 123 LF combination concrete curb and gutter, type m-6. 18 (modified); 188 LF telescoping steel sign support; 31 SF sign panel, type 1; 4 EA removing and resetting street signs; 2 EA remove and relocate trash receptacle; 3 EA bike rack removal; 1,194 SF stamped, colored portland cement concrete sidewalk, 4". See attached file.
AvailableIDOT is soliciting bids for construction of a Portland Cement Concrete (PCC) multi-use trail from E. Grand Street to Lewis Lane in Carbondale, Illinois. The work includes ADA ramps, light pole relocation, and storm sewer improvements, and is scheduled for 70 working days. Bids are due at the IDOT January 16, 2026 letting at 12:00 PM Central via the Departments e-bidding system.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids for construction of a Portland Cement Concrete (PCC) multi-use trail from E. Grand Street to Lewis Lane in Carbondale, Illinois. The work includes ADA ramps, light pole relocation, and storm sewer improvements, and is scheduled for 70 working days. Bids are due at the IDOT January 16, 2026 letting at 12:00 PM Central via the Departments e-bidding system.
AvailableWork include replacing approximately 2,990 SY of non-compliant ADA sidewalks and curb ramps with new ADA compliant sidewalks and curb ramps. Project items include curb and gutter replacement, ornamental brick/stone seat walls, ornamental metal benches, metal trash receptacles, storm drain inlet modifications, water meter resets, site lighting, parking/ADA re-striping, and associated temporary traffic control.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Work include replacing approximately 2,990 SY of non-compliant ADA sidewalks and curb ramps with new ADA compliant sidewalks and curb ramps. Project items include curb and gutter replacement, ornamental brick/stone seat walls, ornamental metal benches, metal trash receptacles, storm drain inlet modifications, water meter resets, site lighting, parking/ADA re-striping, and associated temporary traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis