CountyWI
Aug 7, 2026
Closes
Sep 3, 2026
CTH BD Culvert Replacement
Culvert replacement.
Description: The work under this contract shall consist of removing asphaltic surface milling, HMA pavement, concrete curb and gutter, traffic control, pavement marking, and all incidental items necessary to complete the work.
StateAgency · WI, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Wisconsin Department of Transportation.
These related opportunities are still open for bidding.
CountyWI
Aug 7, 2026
Closes
Sep 3, 2026
Culvert replacement.
CountyWI
Jul 28, 2026
Closes
Aug 25, 2026
Waukesha County is seeking an engineering/design consulting firm for the Highway Safety Improvement Project at the CTH D (Wern Way) and CTH E intersection in the Town of Genesee. The work includes realigning the CTH D approaches, updating signage and pavement markings, conducting surveys and geotechnical investigations, preparing plans and environmental documentation, and supporting public involvement and agency coordination. The RFQ was posted July 28, 2026, and responses are due August 25, 2026; no primary solicitation file was available from the official posting.
CityWI
Aug 6, 2026
Closes
Aug 28, 2026
The project consists of pulverizing .53 mile and adding 4" of 1 1/4" aggregate. Base material added to any inferior portions of Ronnerud Lane to widen the road to two, 10-feet wide driving lanes, grading, re-establishing crown, rolling, watering and applying a double sealcoat. Shoulders added where needed. The project will consist of approx: 500 CY of base material, 200 CY of shoulder material, 4,400 gallons of high float emulsion asphalt, 130 CY of 3/8" clean limestone chips and all labor and equipment to complete the project.
CityWI
Aug 5, 2026
Closes
Aug 27, 2026
Project consists of water main extensions throughout the project limits. Major work items and approximate quantities include: 11,190 LF of PVC watermain directionally bored, 660 LF of HDPE water services, directionally bored; 180 LF of culvert pipe replacement, 275 TN of asphalt surface patching, 20 EA hydrants, 1 LS pressure reducing vault with electrical controls, 2 LS flushing hydrant, 1 LS installation of electrical controls on