81000-214699 - 0.24 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer, signing and pavement markings on Hewitt Road from Packard Road to M-17 (Washtenaw Avenue), Washtenaw County. RFP
Description: 0.24 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer, signing and pavement markings on Hewitt Road from Packard Road to M-17 (Washtenaw Avenue), Washtenaw County. This is a Local Agency project. Required DBE Participation: 0.00% Required SBP Participation: 4.00% Net Classification Required For This Project: ** 1747 Cb or 1747 Ea ** Completion Date: 9/30/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
This local-agency project covers 0.51 miles of Manchester Street in Highland Park, from Woodward Avenue (M-1) northeasterly to Oakland Avenue. The work includes hot-mix asphalt cold milling and resurfacing, storm-sewer installation, concrete curb and gutter, sidewalk and ramp improvements, and signing and pavement markings. The posting identifies the City of Highland Park as the local-agency project sponsor and specifies prequalification requirements for prime contractors.
0.87 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, signing and pavement markings on 3 Mile Road from Riverside Drive easterly to Plainfield Avenue in the city of Grand Rapids, Kent County. This is a Local Agency project. Required DBE Participation: 0.00% Required SBP Participation: 4.00% Net Classification Required For This Project: ** Comb/Jt. 3630 Cb, Ea or Comb/Jt. 3630 Cb, J or Comb/Jt. Completion Date: 7/1/2028 12:00:00 AM
0.41 mi of hot mix asphalt reconstruction including a roundabout, storm sewer, culvert, concrete curb and gutter, sidewalk, shared-use path, signing, guardrail and pavement markings on M-59 at Latson Road, Livingston County. This project includes a 5 year materials and workmanship pavement warranty. Required DBE Participation: 2.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 5290 Ea ** Completion Date: 11/15/2029 12:00:00 AM