47082-210655 - 0.41 mi of hot mix asphalt reconstruction including a roundabout, storm sewer, culvert, concrete curb and gutter, sidewalk, shared-use path, signing, guardrail and pavement markings on M-59 at Latson Road, Livingston County.
Description: 0.41 mi of hot mix asphalt reconstruction including a roundabout, storm sewer, culvert, concrete curb and gutter, sidewalk, shared-use path, signing, guardrail and pavement markings on M-59 at Latson Road, Livingston County. This project includes a 5 year materials and workmanship pavement warranty. Required DBE Participation: 2.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 5290 Ea ** Completion Date: 11/15/2029 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
This local-agency project covers 0.51 miles of Manchester Street in Highland Park, from Woodward Avenue (M-1) northeasterly to Oakland Avenue. The work includes hot-mix asphalt cold milling and resurfacing, storm-sewer installation, concrete curb and gutter, sidewalk and ramp improvements, and signing and pavement markings. The posting identifies the City of Highland Park as the local-agency project sponsor and specifies prequalification requirements for prime contractors.
1.18 mi of hot mix asphalt roadway reconstruction including storm sewer, sanitary sewer, concrete curb, gutter and sidewalk, culvert replacements, retaining walls, bridge superstructure replacement, temporary bridge, guardrail, signing and pavement markings on M-49 from the south village limit to north village limit of Camden, Hillsdale County. This is an Alternate Beam Bid project. Alternate 1 (Section 3) is a Galvanized Press-Brake-Formed Tub Girder Alternative. Alternate 2 (Section 4) is a Plate Girder Alternative. This project includes a 5 year materials and workmanship pavement warranty and a 2 year concrete surface coating warranty. Required DBE Participation: 0.00% Required SBP Participation: 5.00% Net Classification Required For This Project: ** 17341 Ea or Comb/Jt. 17341 Fa, K ** Completion Date: 9/20/2030 12:00:00 AM
RFP documents
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.