Open RFP

7th Floor - BSL-3 Lab Renovations RFP

Description: Work will involve the removal of all existing interior finishes, partitions, ceilings, and associated mechanical, electrical, low voltage, fire alarm, plumbing, and fire protection (mep/fp/fa) systems within the defined project area down to a shell space condition. The renovated space will support a specialized bsl-3 laboratory program. The scope includes the installation of all new mep/fp/ fa elements required to support bsl-3 operations. Major equipment and associated infrastructure will be located either above the ceiling or within the building's mechanical penthouse above. It is to be noted that there will be required roof penetration work for supporting mepfp/design.

Released
Nov 12, 2026
Closes
Dec 18, 2026(27 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts