FederalVA
Aug 19, 2026
Closes
Aug 27, 2026
Cable And Conduit Assembly- New Cumberland -(Request for Quotation)
Provide cable and conduit assembly, NSN 6150014722573, Qty 119 ea
Description: The Defense Logistics Agency (DLA) Aviation issued a Combined Synopsis/Solicitation (RFQ) for NSN 6150014666256 titled 'CABLE AND CONDUIT A' to procure three units for delivery to W1A8 DLA Distribution. Quotes must be submitted electronically via the DIBBS portal as no hard copies, specifications, or drawings are provided for this solicitation. The notice was published on March 29, 2026, and offers are due by April 6, 2026, for this active procurement opportunity.
Federal · VA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Procurement and program contacts connected to Department of Defense Education Activity (DODEA).
These related opportunities are still open for bidding.
FederalVA
Aug 19, 2026
Closes
Aug 27, 2026
Provide cable and conduit assembly, NSN 6150014722573, Qty 119 ea
CityCA
Aug 13, 2026
Closes
Sep 29, 2026
Work consist of 5,025 lf of conduit installation, 7,023 lf of fiber optic cable installation, 4,972 lf of fiber optic cable installation, 380 lf of fiber optic cable installation, 11 ea of pull boxes, 6,575 lf of conduit installation, 7,395 lf of fiber optic cable installation, 270 lf of fiber optic cable installation.
Illinois Department of Transportation
State AgencyIL
-
Closes
Sep 18, 2026
Work includes 1,640 LF fiber optic cable 24 fibers, single mode; 1 EA. fiber optic cable splice; 1 EA. fiber optic utility marker; 145 LF electric cable in conduit, signal no. 14 3C; 145 LF electric cable in conduit, equipment grounding conductor no. 6 1C; 83 LF underground conduit, PVC, 1 1/2" dia; 1,450 LF underground conduit, PVC, 2" dia.; 1,978 LF pipe underdrains 6" (special); 320 LF pipe underdrains for structures 4"; 700 LF pipe underdrains for structures 6". See outside link.
Aug 5, 2026
Closes
Aug 28, 2026
12 EA of Install electrical conduit (¾" conduit runs, per SOW Section 3.2.1), 10 locations, including pull string; 12 EA of Install 4 11/16" gang boxes at WiFi access point locations, connected to conduit installed; 12 EA of Install Category 6A cable at the 10 identified locations, including access cable at each end as needed, and perform cable termination ("punch down") in the Telecommunications Room (TR). See attached file.