Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Re-utilization of an existing pump station building into a concession / bathroom multi-use building. Approximate construction quantities include 50 SY of concrete sidewalk, 40 LF of ornamental fencing, and 1 bike rack.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Reroof of existing building.
Posted Date
Dec 18, 2025
Due Date
Jan 8, 2026
Release: Dec 18, 2025
Close: Jan 8, 2026
Reroof of existing building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes exterior glass & glazing that will be part of the larger renovation of the existing building. See outside link.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2026
Release: Nov 14, 2025
Close: Dec 17, 2026
Work includes exterior glass & glazing that will be part of the larger renovation of the existing building. See outside link.
AvailableReplacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Posted Date
Oct 6, 2025
Due Date
Jan 29, 2026
Release: Oct 6, 2025
Close: Jan 29, 2026
Replacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
AvailableThis project includes the interior demolition of the existing, 2-story building. This building has a combined total area of 145,500 SF. The demolition scope of work includes the removal and disposal of interior walls, doors, ceilings, floor finishes, raised floor system, interior furniture and systems furniture, lighting, electrical, plumbing, mechanical, fire protection.
Posted Date
Dec 21, 2025
Due Date
Jan 7, 2026
Release: Dec 21, 2025
Close: Jan 7, 2026
This project includes the interior demolition of the existing, 2-story building. This building has a combined total area of 145,500 SF. The demolition scope of work includes the removal and disposal of interior walls, doors, ceilings, floor finishes, raised floor system, interior furniture and systems furniture, lighting, electrical, plumbing, mechanical, fire protection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →