Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of mechanical, electrical, plumbing, and fire protection (MEP).
Posted Date
Oct 6, 2025
Due Date
Jan 14, 2026
Release: Oct 6, 2025
Close: Jan 14, 2026
Work consists of mechanical, electrical, plumbing, and fire protection (MEP).
AvailableContract a consists of the installation of approx., 2,050 LF of 6" C900 PVC DR14 waterline and appurtenances including valves, fire hydrant installation, water service line re-connections, and all temporary and permanent surface restoration including lawn, concrete sidewalk, and all necessary appurtenances and restoration for said construction. Contract b consists of roadway surface restoration and paving. The work includes milling of 3,500 SY of existing pavement, placement of 150 TN of 3/4" scratch, paving of 3,500 SY of 9.5mm wearing course (1. 5" depth), base repair, and all necessary traffic control and driveway access, and all necessary appurtenances and restoration for said construction.
Posted Date
Oct 7, 2025
Due Date
Jan 8, 2026
Release: Oct 7, 2025
Close: Jan 8, 2026
Contract a consists of the installation of approx., 2,050 LF of 6" C900 PVC DR14 waterline and appurtenances including valves, fire hydrant installation, water service line re-connections, and all temporary and permanent surface restoration including lawn, concrete sidewalk, and all necessary appurtenances and restoration for said construction. Contract b consists of roadway surface restoration and paving. The work includes milling of 3,500 SY of existing pavement, placement of 150 TN of 3/4" scratch, paving of 3,500 SY of 9.5mm wearing course (1. 5" depth), base repair, and all necessary traffic control and driveway access, and all necessary appurtenances and restoration for said construction.
Ramsey County Public Works is soliciting consultant proposals to provide engagement and preliminary design services for the White Bear Avenue Corridor Study. The work includes community engagement and preliminary corridor design tasks to evaluate and recommend improvements for White Bear Avenue. Proposals are due January 15, 2026 and the procurement is being distributed by DemandStar.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Ramsey County Public Works is soliciting consultant proposals to provide engagement and preliminary design services for the White Bear Avenue Corridor Study. The work includes community engagement and preliminary corridor design tasks to evaluate and recommend improvements for White Bear Avenue. Proposals are due January 15, 2026 and the procurement is being distributed by DemandStar.
AvailableWork consists of: installation of (2) new 1400 ton electrical water cooled chillers within1 central plant along with associated cooling towers, pumps, controls, piping and miscellaneous mechanical,2 electrical and plumbing equipment.
Posted Date
Oct 16, 2025
Due Date
Jan 29, 2026
Release: Oct 16, 2025
Close: Jan 29, 2026
Work consists of: installation of (2) new 1400 ton electrical water cooled chillers within1 central plant along with associated cooling towers, pumps, controls, piping and miscellaneous mechanical,2 electrical and plumbing equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis