Retrieving RFP details
Release
Close
Wisconsin Department of Administration
Work consists of mechanical, electrical, plumbing, and fire protection (MEP).
MEP - Fourth Avenue Corridor Utility Replacement
zip
Wisconsin Department of Administration
Replacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Knoxville Utilities Board (KUB)
This work is to be bid only by KUB pre-qualified contractors in the following areas: 2.5 Wastewater Plant Construction, Unlimited. Fourth Creek WWTP Chlorine Contact Tank Gate Replacement.
Wisconsin Department of Administration
In general, the work consists of: installing a new 1,200-ton centrifugal chiller, new cooling towers, piping and pumps within East Chiller Plant. Work also includes installation of new exterior electrical yard along with new underground chilled water supply and return piping. Entire project area will be restored to original conditions.
Release
Oct 06, 2025
Close
Nov 06, 2025