Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge rehabilitation including epoxy overlay, beam repair, replace expansion joint and guardrail work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge rehabilitation - beam replacement - bridge deck grooving maintenance; prestressed. Concrete i beam type ii-(+55'to 60'); signs and pavement marking.
Posted Date
Jan 13, 2026
Due Date
Feb 25, 2026
Release: Jan 13, 2026
Close: Feb 25, 2026
Bridge rehabilitation - beam replacement - bridge deck grooving maintenance; prestressed. Concrete i beam type ii-(+55'to 60'); signs and pavement marking.
AvailablePortable changeable message sign (ls); street sweeping; 84 CY roadway excavation; 280 CY slurry cement fill; 2 ea move-in/move-out (erosion control); 34,200 rolled erosion control product (blanket).
Posted Date
Nov 10, 2025
Due Date
Jan 22, 2026
Release: Nov 10, 2025
Close: Jan 22, 2026
Portable changeable message sign (ls); street sweeping; 84 CY roadway excavation; 280 CY slurry cement fill; 2 ea move-in/move-out (erosion control); 34,200 rolled erosion control product (blanket).
AvailableWork include 40 LF of removal of curb & gutter; 641 SY of removal of bituminous surfacing; 1 LS of removal of existing retaining wall; 511 TN of salvaged base course; 155 TN of commercial grade hot mix asphalt; 360 SY of bridge approach slab-remove & replace; 22,074 SY of penetrating water repellent treatment; 3,830 LF of bridge deck crack sealing; 18,660 sf of special surface finish; 846 CY of overlay concrete; 34 CY of deck concrete; 102 SY of class 4 removal; 194 sf of deck spall repair; 4 EA of portable rumble strips; 29 EA of type iii barricade; 2 EA of sidewalk barricade; etc, see attached file.
Posted Date
Dec 22, 2025
Due Date
Jan 16, 2026
Release: Dec 22, 2025
Close: Jan 16, 2026
Work include 40 LF of removal of curb & gutter; 641 SY of removal of bituminous surfacing; 1 LS of removal of existing retaining wall; 511 TN of salvaged base course; 155 TN of commercial grade hot mix asphalt; 360 SY of bridge approach slab-remove & replace; 22,074 SY of penetrating water repellent treatment; 3,830 LF of bridge deck crack sealing; 18,660 sf of special surface finish; 846 CY of overlay concrete; 34 CY of deck concrete; 102 SY of class 4 removal; 194 sf of deck spall repair; 4 EA of portable rumble strips; 29 EA of type iii barricade; 2 EA of sidewalk barricade; etc, see attached file.
Bridge rehabilitation including deck patching, replace hot mix asphalt wearing surface and approach work.
Posted Date
Oct 3, 2025
Due Date
Feb 6, 2026
Release: Oct 3, 2025
Close: Feb 6, 2026
Bridge rehabilitation including deck patching, replace hot mix asphalt wearing surface and approach work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis