CityMO
Posted
Sep 22, 2026
Oct 15, 2026
Marilynn Ave. Bridge Removal & Replacement
The project consists of the removal and replacement of bridge. 1,041 CY excavation; 278 SY aggregate base; 480 SY sodding.
Description: Bridge replacement of an existing structure, bridge replacement of an existing structure carrying railroad street over west branch sugar creek, water main relocation under railroad street, water main & sanitary sewer relocations under redington avenue, bridge approach paving, guiderail, sidewalk replacement, and other related work within an overall length of 300 LF (0.057 miles).
StateAgency · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Pennsylvania Department of Transportation.
Adjacent opportunities open for bidding right now.
CityMO
Posted
Sep 22, 2026
Oct 15, 2026
The project consists of the removal and replacement of bridge. 1,041 CY excavation; 278 SY aggregate base; 480 SY sodding.
Posted
Sep 8, 2026
Oct 8, 2026
West Virginia Department of Transportation
State AgencyWV
Posted
Aug 8, 2026
Oct 20, 2026
Structure Replacement O'brion Creek Bridge.
StateON
Posted
Sep 18, 2026
Oct 19, 2026
The Government of Ontario, through the Ministry of Natural Resources, is seeking a contractor for the removal and replacement of the Doorley Creek and Morrow Lake bridges on Doorley Creek Road in Greater Madawaska, Ontario. The work includes removing existing bridge and culvert components, excavation and rock removal, and installing modular steel bridge superstructures, timber decks, and steel beam guard rails according to engineered specifications. This is an open construction tender, not a grant program; in-water work must be completed by September 24, 2027, and all work by October 1, 2027.